| _____________________________________ |
|
Construction of rail-mounted vehicles |
|
| The focus of our work are projects in construction of rail-mounted vehicles. |
|
| Our work profile covers following range: |
|
Complex preparation of geometric measuring tasks (ie. according to DIN 25043): |
|
Targets: time efficiency, high accuracy, process safety, workshop fitness, easy accomplishment |
|
| Realization: |
|
| • | analysis of vehicle specific requirements |
| • | optimization of the measure sheets in collaboration with the contruction |
| • | selection of measuring tools (combination of conventional and optical or laser supported measuring technics) |
| • | development / provision of required measuring tools |
| • | programming of the measuring systems for an automated measuring process |
| • | development of own evaluation/analysis software for automatic generation of measure sheets |
| • | training of personnel on location |
| • | support of the projects throughout the production process of the series (include modifications or the like) |
| Determination of wheel vertical forces |
|
| • | analysis of vehicle specific requirements |
| • | conception of new resp. modification of existing railway track scales |
| • | development of stategies for the systematic accomplishment of measuring and adjustment tasks |
| • | training of personnel on location |
| Special measurements | |
| • | measurements for the assembly and adjustment resp. recurring inspection of large devices |
| • | systeatic geometry and deformation analyses during the production progress (quantization and optimization of influenting variables) |
| • | measure-technologic analysis of complicated geometries (also stock-receipt) |
| • | cooperation for the determination of vehicle specific parameters (ie. center of gravity, roll center height / roll angle, inclination coefficient) |
| • | measure-technologic analysis of interfaces of single modules, ie. for making controversies concrete |
| Examples: - measurement windshield and vehicle body cutout - measurement door blade and door cutout |
|
| _____________________________________ | |
Aviation |
|
| In expansion of our field of work we could accomplish first projects in the area of aviation. These are associated with the stress test of the Airbus A380. |
|
| • | measuring of a reference point system in the test hall for the Airbus A380 |
| • | measurement respective the positioning of the airplane structure of the Airbus A380 |
| • | measuring of the wing machines for the assembly of the Airbus A380 |
| • | in general our engineering bureau offers the same range of services as we offer in the field of construction of rail-mounted vehicles, which is accomodated to the specific requirements of this branch |
| _____________________________________ | |
Wind power plants |
|
| • | analysis of the geometry of a rotor blade (34m long) of a wind power plant via laser tracker |
| • | analysis of the geometry of a production appliance for rotor blades via lasertracker |
| • | determination and adjustment of the blade angles on installed wind power plants (patent in work) |
| • | measuring of flanges (foundation) on location |
| _____________________________________ | |
In general our engineering bureau offers the same range of services for other branches as we offer in the field of construction of rail-mounted vehicles, which is accomodated to the specific requirements of this branch. |
|